Simple development plan (einfacher Bebauungsplan) · Draft
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 9. Änderung
The development plan covers an area in Residenzstadt Neustrelitz, Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Draft). The plan area covers about 2,570 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Residenzstadt Neustrelitz
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Draft
Decision to draw up the plan on 14 September 2023 - Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 30/93
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 2,570 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Draft. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 9, latest version (this page)
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 9. Änderung
In progress: Draft about 2,570 m²
-
Amendment no. 8
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 8. Änderung
In force since 14 September 2019 about 1.9 ha
-
Amendment no. 7
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 7. Änderung
In force since 22 December 2018 about 2.4 ha
-
Amendment no. 6
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 6. Änderung
In force since 6 August 2016 about 5.7 ha
-
Amendment no. 5
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 5. Änderung
In force since 4 July 2015 about 9,160 m²
-
Amendment no. 4
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 4. Änderung
In force since 14 December 2013 about 2,350 m²
-
Amendment no. 3
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 3. Änderung
In force since 21 September 2013 about 1.1 ha
-
Amendment no. 2
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 2. Änderung
In force since 8 October 2011 about 1,250 m²
-
Amendment no. 1
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See 1. Änderung
In force since 15 September 2004 about 5.8 ha
-
Original version
BPlan Nr. 30/93 Neustrelitz, Residenzstadt Ehemaliges GUS-Objekt am Glambecker See
In force since 9 November 2002 about 23.3 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 58/07 Neustrelitz, Residenzstadt Töpferberg/ Seegang
In force since 31 July 2008 500 m away
-
BPlan Nr. 65/11 Neustrelitz, Residenzstadt Seegang/ Milowsgang
In force since 13 July 2013 500 m away
-
BPlan Nr. 78/23 Neustrelitz, Residenzstadt Ehemaliger Bahndamm/ Bahnwerk
In progress: Decision to draw up the plan 550 m away
-
BPlan Nr. 12/91 Neustrelitz, Residenzstadt Zierker Straße/ Sandberg , 5. Änderung
In force since 24 September 2022 600 m away 3 versions
-
BPlan Nr. 12/91 Neustrelitz, Residenzstadt Zierker Straße/ Sandberg , 4. Änderung und 2. Ergänzung
In force since 19 January 2019 600 m away
-
BPlan Nr. 55/07 Neustrelitz, Residenzstadt Alter Schlachthof
In progress: Draft 650 m away
-
BPlan Nr. 07/91- 94 Neustrelitz, Residenzstadt Augustastraße/ Kasernenstraße
In force since 18 August 2001 900 m away
-
BPlan Nr. 69(1)/12-19 Neustrelitz, Residenzstadt Dr.-Schwentner-Straße
In force since 6 February 2022 1.0 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.