Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 17 Neuenkirchen "Wohnbebauung östlich des Alwine-Wuthenow-Rings"
The development plan covers an area in the municipality of Neuenkirchen, Landkreis Vorpommern-Greifswald. It has been in force since 16 November 2024. The plan area covers about 8,330 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Neuenkirchen
- District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- In force since 16 November 2024
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 17
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 8,330 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a house in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 18 Neuenkirchen "Südlich Marktflecken"
In force since 20 July 2024 750 m away
-
BPlan Nr. 1 Neuenkirchen OT Neuenkirchen Sonderbaugebiet an der F 96
In force since 13 July 2006 1.0 km away
-
Innenbereichssatzung Neuenkirchen OT Oldenhagen
In force since 8 February 1994 1.4 km away
-
BPlan Nr. 12 Greifswald, Universitäts- und Hansestadt Am Rosental
In force since 15 June 2006 2.0 km away Universitäts- und Hansestadt Greifswald
-
BPlan Nr. 12 Greifswald, Universitäts- und Hansestadt Am Rosental, 1. Ergänzung und 1. Änderung
In force since 6 November 2008 2.1 km away Universitäts- und Hansestadt Greifswald
-
BPlan Nr. 100 Greifswald, Universitäts- und Hansestadt Veranstaltungsfläche
In force since 31 August 2006 2.2 km away Universitäts- und Hansestadt Greifswald
-
BPlan Nr. 30 Greifswald, Universitäts- und Hansestadt Holzteichquartier, 1. Änderung
In force since 20 July 2000 2.3 km away Universitäts- und Hansestadt Greifswald 2 versions
-
BPlan Nr. 110 Wackerow OT Wackerow Sondergebiet Photovoltaik
In progress: Consultation of authorities 2.3 km away Wackerow
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.