Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 1 Neuenkirchen OT Müggenburg Windpark 1. Änderung
The development plan covers an area in the municipality of Neuenkirchen (Müggenburg area), Landkreis Vorpommern-Greifswald. It has been in force since 9 December 2010. The plan area covers about 128 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Neuenkirchen
Village or district Müggenburg - District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- In force since 9 December 2010
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 1 - Area
- about 128 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For an energy facility in this area, you usually need these surveys.
-
To secure the land: land parcels and owners
We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms
-
For the planning: topographic survey plan
Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.
-
For the permit: site plan
Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.
-
Before building starts: setting out
Foundations, fence, module rows, crane pads and access roads, on request during construction.
-
After completion: building survey and as-built records
Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 1, latest version (this page)
BPlan Nr. 1 Neuenkirchen OT Müggenburg Windpark 1. Änderung
In force since 9 December 2010 about 128 ha
-
Original version
BPlan Nr. 1 Neuenkirchen OT Müggenburg Windpark
In force since 9 March 2001 about 129 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 4 Sarnow "PV Hermannshof-Panschow"
In progress: Draft 1.7 km away Sarnow
-
Innenbereichssatzung Butzow OT Alt Teterin
In progress: Draft 2.1 km away Butzow
-
BPlan Nr. 3-2022 Anklam, Hansestadt Solarpark Stretense
In progress: Decision to draw up the plan 2.2 km away Hansestadt Anklam
-
Vorhabensbezogener BPlan Nr. 5 Neuenkirchen "Photovoltaikanlage Neuenkirchen"
In progress: Decision to draw up the plan 2.5 km away
-
Vorhabensbezogener BPlan Nr. 6 Neuenkirchen Agri-PV-Anlage Neuenkirchen A II
In progress: Decision to draw up the plan 3.2 km away
-
Innenbereichssatzung Sarnow OT Sarnow
In force since 17 December 1998 3.3 km away Sarnow
-
Vorhabensbezogener BPlan Nr. 4 Spantekow "Solarpark Drewelow"
In progress: Draft 3.5 km away Spantekow
-
BPlan Nr. 2 Neuenkirchen Eigenheime an der Dorfstr.
In force since 5 July 2007 3.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.