Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 16 Lüdersdorf OT Herrnburg Gegenüber Schule 1. Änderung
The development plan covers an area in the municipality of Lüdersdorf (Herrnburg area), Landkreis Nordwestmecklenburg. It has been in force since 29 May 2010. The plan area covers about 8,010 square metres.
There is a newer version: Amendment no. 2, In force since 30 April 2011
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Lüdersdorf
Village or district Herrnburg - District
- Nordwestmecklenburg
Surveying in this region - Legal status
- In force since 29 May 2010
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 16
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 8,010 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
BPlan Nr. 16 Lüdersdorf OT Herrnburg Gegenüber Schule 2. Änderung
In force since 30 April 2011 about 8,010 m²
-
Amendment no. 1 (this page)
BPlan Nr. 16 Lüdersdorf OT Herrnburg Gegenüber Schule 1. Änderung
In force since 29 May 2010 about 8,010 m²
-
Original version
BPlan Nr. 16 Lüdersdorf OT Herrnburg Gegenüber Schule
In force since 31 October 2009 about 1.5 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 22 Lüdersdorf OT Herrnburg Hauptstr. südl. Schule
In force since 27 March 2010 300 m away
-
BPlan Nr. 5 Lüdersdorf OT Herrnburg Peermoor 15. Änderung
In force since 26 June 2010 350 m away 7 versions
-
Vorhabensbezogener BPlan Nr. 18 Lüdersdorf OT Herrnburg Nördl. Bahnhofstr. 1. Änderung
In force since 1 May 2010 350 m away 2 versions
-
BPlan Nr. 3, 10. Änd. Lüdersdorf Krüzkamp
In progress: Draft 400 m away
-
BPlan Nr. 6a Lüdersdorf OT Herrnburg Flohmarktgelände 2. Änderung
In force since 29 March 2013 400 m away 3 versions
-
BPlan Nr. 24 Lüdersdorf OT Herrnburg Einzelhandel am Bahnhof
In force since 30 October 2021 450 m away
-
BPlan Nr. 3 Lüdersdorf OT Herrnburg Krüzkamp 9. Änderung
In force since 30 January 1999 500 m away 5 versions
-
BPlan Nr. 17 Lüdersdorf OT Herrnburg Bookhorstkoppel
In force since 29 August 2025 650 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.