Development plan (Bebauungsplan) · Early consultation of authorities
BPlan Nr. 3 Kriesow Allgemeines Wohngebiet Tüzen
The development plan covers an area in the municipality of Kriesow (Tüzen area), Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Early consultation of authorities). The plan area covers about 1.6 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Kriesow
Village or district Tüzen - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Early consultation of authorities
- Type of plan
- Development plan (Bebauungsplan)
No. 3 - Area
- about 1.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Early consultation of authorities. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
While the plan is being drawn up and later during construction, you usually need these surveys.
-
Now: create the basis
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain. It is the basis for the plan and for first designs. Topographic survey plan
-
With the roads and services: form the plots
We divide the land into building plots according to the plan and form the new land parcels. Dividing land
-
For each building project: from site plan to building survey
Once the plan is in force, you need a site plan for the building application, setting out and, after completion, the official building survey. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Vorhabensbezogener BPlan Nr. 1 Kriesow Allgemeines Wohngebiet Tüzen
In force since 2 January 1997 under 100 m away
-
Innenbereichssatzung Kriesow OT Kriesow
In force since 17 June 1998 1.3 km away
-
In force since 3 March 2006 1.7 km away Ivenack
-
In force since 13 July 1999 2.9 km away Wolde
-
BPlan Nr. 4 Ivenack Am Feldrand
In progress: Decision to draw up the plan 3.0 km away Ivenack
-
BPlan Nr. 1 Wolde Bebauungsplan Wolde Gewerbegebiet Zwiedorf Nr. 1
In force since 1 November 2005 3.0 km away Wolde
-
In force since 12 June 2021 3.1 km away Röckwitz
-
BPlan Nr. 1 Ivenack Hofplatz, Grischow
In force since 7 January 1998 3.5 km away Ivenack
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.