Development plan (Bebauungsplan) · In force
BPlan Nr. 1 Kramerhof Klein Kedingshagen
The development plan covers an area in the municipality of Kramerhof (Klein Kedingshagen area), Landkreis Vorpommern-Rügen. It has been in force since 4 September 1994. The plan area covers about 6.9 hectares.
There is a newer version: Amendment no. 2, In force since 22 December 2004
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Kramerhof
Village or district Klein Kedingshagen - District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 4 September 1994
- Type of plan
- Development plan (Bebauungsplan)
No. 1 - Area
- about 6.9 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
BPlan Nr. 1 Kramerhof Klein Kedingshagen 2. Änderung
In force since 22 December 2004 about 6.9 ha
-
Amendment no. 1
BPlan Nr. 1 Kramerhof Klein Kedingshagen 1. Änderung
In force since 2 March 1996 about 6.9 ha
-
Original version (this page)
BPlan Nr. 1 Kramerhof Klein Kedingshagen
In force since 4 September 1994 about 6.9 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Kramerhof Klein Kedingshagen 2. Änderung
In force since 9 May 2001 200 m away 2 versions
-
BPlan Nr. 17 Kramerhof Klein Kedingshagen 2. Änderung
In force since 28 May 2023 350 m away 3 versions
-
BPlan Nr. 5 Kramerhof Groß Kedingshagen 9. Änderung
In force since 29 September 2018 800 m away 11 versions
-
Vorhabensbezogener BPlan Nr. 11 Stralsund, Hansestadt "Wohngebiet westlich der Parower Chaussee"
In force since 18 January 1996 1.2 km away Hansestadt Stralsund
-
In force since 9 October 1997 1.2 km away Hansestadt Stralsund
-
In progress: Draft 1.2 km away Hansestadt Stralsund
-
BPlan Nr. 15 Stralsund, Hansestadt "Wohngebiet östlich der Parower Chaussee"
In force since 11 November 1999 1.4 km away Hansestadt Stralsund
-
Innenbereichssatzung Kramerhof Parow Parkweg 2. Änderung
In force since 9 December 2007 1.4 km away 2 versions
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.