Development plan (Bebauungsplan) · In force
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West 3. Änderung 3. Änderung
The development plan covers an area in Stadt Hagenow, Landkreis Ludwigslust-Parchim. It has been in force since 1 April 2015. The plan area covers about 3.4 hectares.
There is a newer version: Amendment no. 4, In force since 5 July 2023
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Hagenow
- District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In force since 1 April 2015
- Type of plan
- Development plan (Bebauungsplan)
No. 9 - Area
- about 3.4 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What does a development plan regulate?
It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 4, latest version
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West 4. Änderung 4. Änderung
In force since 5 July 2023 about 3.4 ha
-
Amendment no. 3 (this page)
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West 3. Änderung 3. Änderung
In force since 1 April 2015 about 3.4 ha
-
Amendment no. 2
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West 2. Änderung 2. Änderung
In force since 1 August 2013 about 3.4 ha
-
Amendment no. 1
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West 1. Änderung 1. Änderung
In force since 4 March 1994 about 3.4 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 9 Hagenow, Stadt Gewerbepark West Ursprungsplan
In force since 13 May 1993 under 100 m away
-
BPlan Nr. 36 Hagenow, Stadt Wohnsiedlung, Am Prahmer Berg Ursprungsplan
In force since 1 February 2010 450 m away
-
BPlan Nr. 39 Hagenow, Stadt Wohnungsbau Ehemaliger Schornstein- und Feuerungsbau Ursprungsplan
In force since 21 December 2012 550 m away
-
BPlan Nr. 40 Hagenow, Stadt Am Jugendpark, Parkstraße Ursprungsplan
In force since 1 March 2016 750 m away
-
BPlan Nr. 34 Hagenow, Stadt Wohnstandort Sputnikweg im Wohngebiet Neue Heimat Ursprungsplan
In force since 22 March 2007 1.3 km away
-
BPlan Nr. 42 Hagenow, Stadt Wohnbebauung Hagenow-Heide-Chaussee II Ursprungsplan
In force since 19 October 2018 1.6 km away
-
BPlan Nr. 20 Hagenow, Stadt Ziegelei an der Wittenburger Straße 3. Änderung 3. Änderung
In force since 1 May 2017 1.8 km away 3 versions
-
BPlan Nr. 20 Hagenow, Stadt Ziegelei an der Wittenburger Straße Ursprungsplan
In force since 11 September 1997 1.8 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.