Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 040-150e-BP00100 Groß Wokern Satzung der Gemeinde Groß Wokern zum Bebauungsplan Nr. 1 Gewerbegebiet Neu Wokern "Am Steinbrink"
The development plan covers an area in the municipality of Groß Wokern (Neu Wokern area), Landkreis Rostock. It has been in force since 8 February 1993. The plan area covers about 18.7 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Groß Wokern
Village or district Neu Wokern - District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 8 February 1993
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 040-150e-BP00100 - Area
- about 18.7 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In force since 18 September 2011 200 m away
-
In force since 19 April 1994 200 m away
-
In force since 8 February 2020 900 m away
-
In force since 15 July 2018 1.0 km away
-
In force since 2 August 2015 1.0 km away
-
In force since 30 June 1997 1.2 km away
-
In force since 9 May 2004 1.2 km away
-
In progress: Draft 1.4 km away Groß Roge
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.