Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 1 Grabow, Stadt 4. Änderung "Gewerbepark Grabow West 1.BA" Änderung
The development plan covers an area in Stadt Grabow, Landkreis Ludwigslust-Parchim. It has been in force since 7 April 2006. The plan area covers about 4.6 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 14 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 14 October 2026
- Location
- Stadt Grabow
- District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In force since 7 April 2006
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 1
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 4.6 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the simplified procedure under § 13 BauGB.
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
In force since 22 May 1996 under 100 m away
-
In force since 5 May 2025 350 m away
-
In force since 6 October 2006 1.0 km away
-
In force since 7 July 2018 1.1 km away
-
BPlan Nr. 9 Grabow, Stadt 2. Änderung Bebauungsplan Nr. 9 "Westliche Alstadt"
In force since 7 July 2018 1.5 km away 2 versions
-
Vorhabensbezogener BPlan Nr. (VE 4) Grabow, Stadt OT Grabow Tankstelle B5/ Ludwigsluster Chaussee
In force since 2 April 2011 1.5 km away
-
BPlan Nr. 9 Grabow, Stadt "Westliche Altstadt" Urspungsplan
In force since 7 June 2010 1.5 km away
-
Vorhabensbezogener BPlan Nr. (VE 1) Grabow, Stadt "Neubau Altenpflegeheim" Ursprungsplan
In force since 21 May 1998 1.5 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 14 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.