Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 2, 9. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
The development plan covers an area in Stadt Friedland, Landkreis Mecklenburgische Seenplatte. It has been in force since 29 July 2015. The plan area covers about 1,250 square metres.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Friedland
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 29 July 2015
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 2, 9. Änderung
Accelerated procedure for inner development (beschleunigtes Verfahren, § 13a BauGB) - Area
- about 1,250 m²
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
The municipality drew up the development plan using the accelerated procedure for inner development under § 13a BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 9, latest version (this page)
BPlan Nr. 2, 9. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 29 July 2015 about 1,250 m²
-
Amendment no. 6
BPlan Nr. 2, 6. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 13 June 2012 about 1.6 ha
-
Amendment no. 5
BPlan Nr. 2, 5. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 24 December 2003 about 1.0 ha
-
Amendment no. 4
BPlan Nr. 2, 4. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 26 November 2003 about 1,810 m²
-
Amendment no. 3
BPlan Nr. 2, 3. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 11 June 2003 about 7,960 m²
-
Amendment no. 2
BPlan Nr. 2, 2. Änderung Friedland, Stadt Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 19 December 2000 about 4.7 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 4 Friedland, Stadt OT Friedland Quartier Turmstr./ Riemannstr./ Marienstr./ Mühlenstr.
In force since 3 April 1999 450 m away
-
BPlan Nr. 2 Friedland, Stadt OT Friedland Südl. Stadterweiterung Woldegker Chaussee, Gymnasium
In force since 5 July 1994 500 m away
-
BPlan Nr. 10 Friedland, Stadt OT Friedland Wohnquartier Mühlenstr./ Färberstr.
In force since 20 October 1999 550 m away
-
BPlan Nr. 15 Friedland, Stadt OT Friedland Wohnquartier Mühlenstr., Riemannstr., Schwanbecker Str.
In force since 28 June 2006 550 m away
-
BPlan Nr. 3 ,6. Änderung Friedland, Stadt Am Mühlenteich, südl. Stadteinfahrt
In force since 25 October 2019 600 m away 4 versions
-
BPlan Nr. 3 Friedland, Stadt OT Friedland Am Mühlenteich, südl. Stadteinfahrt
In force since 22 July 1998 650 m away
-
In progress: Consultation of authorities 750 m away
-
Innenbereichssatzung Friedland, Stadt Ergänzungssatzung ´Am Poggenpuhl´
In force since 24 December 2003 850 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.