Qualified development plan (qualifizierter Bebauungsplan) · Consultation of authorities
BPlan Nr. 24 B, 1.Änderung Friedland, Stadt Photovoltaik Alte Klärteiche Zuckerfabrik, 2.Bauabschnitt_PV
The development plan covers an area in Stadt Friedland, Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Consultation of authorities). The plan area covers about 38.4 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Stadt Friedland
- District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In progress: Consultation of authorities
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 24 B, 1.Änderung
Simplified procedure (vereinfachtes Verfahren, § 13 BauGB) - Area
- about 38.4 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Consultation of authorities. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).
When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.
The municipality is drawing up the development plan using the simplified procedure under § 13 BauGB.
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For an energy facility in this area, you usually need these surveys.
-
To secure the land: land parcels and owners
We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms
-
For the planning: topographic survey plan
Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.
-
For the permit: site plan
Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.
-
Before building starts: setting out
Foundations, fence, module rows, crane pads and access roads, on request during construction.
-
After completion: building survey and as-built records
Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 24 B Friedland, Stadt Photovoltaik Alte Klärteiche Zuckerfabrik, 2. Bauabschnitt_PV
In force since 12 June 2013 under 100 m away
-
In force since 12 June 2013 150 m away
-
BPlan Nr. 24 A Friedland, Stadt Photovoltaik Alte Klärteiche Zuckerfabrik, Teilgebiet Südost_PV
In force since 12 June 2013 200 m away
-
BPlan Nr. 6a Friedland, Stadt OT Friedland Wohnen am Galgenberg
In force since 9 March 2004 300 m away
-
BPlan Nr. 1. Änderung Friedland, Stadt Gewerbegebiet Anklamer Chaussee
In force since 6 March 2004 350 m away
-
BPlan Friedland, Stadt OT Friedland Gewerbegebiet Anklamer Chaussee
In force since 3 June 1996 400 m away
-
BPlan Nr. 14 Friedland, Stadt OT Friedland Wochenendhausgebiet An der Kleinbahn
In force since 14 May 2003 600 m away
-
Innenbereichssatzung Friedland, Stadt Ergänzungssatzung ´Am Verwaltergang´
In force since 29 June 2006 750 m away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.