Qualified development plan (qualifizierter Bebauungsplan) · In force

BPlan Nr. 31 Demmin, Hansestadt Photovoltaikanlage Mozartstraße_PV (kein Plandokument vorhanden)

The development plan covers an area in Hansestadt Demmin, Landkreis Mecklenburgische Seenplatte. It has been in force since 25 December 2011. The plan area covers about 2.8 hectares.

Request a quote

Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes

At a glance

Details according to the Bauportal M-V, as of 13 October 2026

Location
Hansestadt Demmin
District
Mecklenburgische Seenplatte
Surveying in this region
Legal status
In force since 25 December 2011
Type of plan
Qualified development plan (qualifizierter Bebauungsplan)
No. 31
Area
about 2.8 ha

Legal status

Can you build here?

The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.

Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).

What is a qualified development plan?

It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).

Which survey you need and when

For an energy facility in this area, you usually need these surveys.

  1. To secure the land: land parcels and owners

    We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms

  2. For the planning: topographic survey plan

    Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.

  3. For the permit: site plan

    Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.

  4. Before building starts: setting out

    Foundations, fence, module rows, crane pads and access roads, on request during construction.

  5. After completion: building survey and as-built records

    Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)

Where the information comes from

Development plans and bylaws
Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
Parcels
Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
Background maps
basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.

Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.

Are you planning to build in this area?

We tell you which survey you need and provide the site plan, setting out and official building survey from one office.