Qualified development plan (qualifizierter Bebauungsplan) · In force
BPlan Nr. 1, 1. Änderung Datzetal Am Park
The development plan covers an area in the municipality of Datzetal (Salow area), Landkreis Mecklenburgische Seenplatte. It has been in force since 27 July 1999. The plan area covers about 2.2 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Datzetal
Village or district Salow - District
- Mecklenburgische Seenplatte
Surveying in this region - Legal status
- In force since 27 July 1999
- Type of plan
- Qualified development plan (qualifizierter Bebauungsplan)
No. 1, 1. Änderung - Area
- about 2.2 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a qualified development plan?
It sets at least the type and extent of building use, the parts of the plots that may be built on and the local roads and paths. A project is allowed if it does not go against these rules and access and services are secured (§ 30 Abs. 1 BauGB).
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 1 Datzetal OT Salow Am Park
In progress: Decision to draw up the plan under 100 m away
-
Vorhabensbezogener BPlan Nr. 4 Datzetal OT Salow Erweiterung IPTE Schönhof
In force since 26 July 2019 300 m away
-
BPlan Nr. 3 Datzetal Photovoltaikanlage Salow, Werk 1_PV
In force since 12 June 2013 850 m away
-
In force since 26 September 2026 1.7 km away Stadt Friedland
-
BPlan Nr. 18 Friedland, Stadt OT Friedland Erweiterung Windeignungsgebiet Treptower Feld
In force since 14 November 2007 1.9 km away Stadt Friedland
-
Vorhabensbezogener BPlan Nr. 7 Friedland, Stadt Windpark Treptower Feld_WEA
In force since 25 January 2000 2.0 km away Stadt Friedland
-
Vorhabensbezogener BPlan Nr. 7/96, Aufhebung Friedland, Stadt Windpark Treptower Feld
In force since 24 May 2025 2.0 km away Stadt Friedland
-
BPlan Nr. 23 Friedland, Stadt Photovoltaikanlage Bresewitzer Brille_PV
In force since 29 November 2017 2.4 km away Stadt Friedland
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.