Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf 4. Änderung 4. Änderung
The development plan covers an area in the municipality of Broderstorf (Neuendorf area), Landkreis Rostock. It has been in force since 8 June 2024. The plan area covers about 49.1 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Broderstorf
Village or district Neuendorf - District
- Landkreis Rostock
Surveying in this region - Legal status
- In force since 8 June 2024
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 5 - Area
- about 49.1 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a commercial or industrial building in this area, you usually need these surveys.
-
For the planning: topographic survey plan
Existing features, boundaries and heights of the site, on request as a digital terrain model. Site plans and terrain models
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V, if needed with the documents for a public easement (Baulast).
-
Before building starts: earthworks and setting out
We calculate cut and fill and set out axes, routes and the building pit.
-
During construction: control measurements
Site control network, monitoring of structures, and settlement and deformation measurements.
-
After completion: building survey and as-built records
Official survey of new buildings under § 28 GeoVermG M-V and records of the finished site. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 4, latest version (this page)
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf 4. Änderung 4. Änderung
In force since 8 June 2024 about 49.1 ha
-
Amendment no. 3
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf 3. Änderung 3. Änderung
In force since 21 March 2013 about 49.1 ha
-
Amendment no. 2
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf 2. Änderung 2. Änderung
In force since 20 September 2010 about 49.1 ha
-
Amendment no. 1
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf 1. Änderung 1. Änderung
In force since 25 March 1997 about 49.1 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 5 Broderstorf Gewerbegebiet Neuendorf Ursprungsplan
In force since 6 July 1994 under 100 m away
-
BPlan Nr. 2 Broderstorf Sonder- und Gewerbegebiet Neuendorf Ursprungsplan
In force since 8 April 1993 250 m away
-
BPlan Nr. 3 Broderstorf B-Plan Nr. 3 Mischgebiet Neuendorf 3. Änderung 3. Änderung
In force since 20 September 2010 500 m away 3 versions
-
BPlan Nr. 3 Broderstorf B-Plan Nr. 3 Mischgebiet Neuendorf Ursprungsplan
In force since 1 February 1994 500 m away
-
BPlan Nr. 2 Broderstorf Sonder- und Gewerbegebiet Neuendorf , 2. Änderung 2. Änderung 2. Änderung
In progress: Draft 550 m away
-
Innenbereichssatzung Roggentin Roggentin Ursprungsplan
In force since 2 April 1992 600 m away Roggentin
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" 2. Änderung 2. Änderung
In force since 16 October 2011 750 m away Roggentin 2 versions
-
BPlan Nr. 2 Roggentin Gewerbegebiet "Pastower Weg" Ursprungsplan
In force since 26 May 1992 750 m away Roggentin
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.