Development plan (Bebauungsplan) · Early public consultation

BPlan Blankensee Biogasanlage Wanzka

The development plan covers an area in the municipality of Blankensee (Wanzka area), Landkreis Mecklenburgische Seenplatte. It is being drawn up (last known step: Early public consultation). The plan area covers about 3.1 hectares.

Request a quote

Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes

At a glance

Details according to the Bauportal M-V, as of 13 October 2026

Location
Blankensee
Village or district Wanzka
District
Mecklenburgische Seenplatte
Surveying in this region
Legal status
In progress: Early public consultation
Decision to draw up the plan on 30 April 2024
Type of plan
Development plan (Bebauungsplan)
No. 0
Area
about 3.1 ha

Legal status

Can you build here?

Usually not yet under this development plan. The municipality is still drawing it up. The last known step is: Early public consultation. Until it comes into force, the law that applied before still decides what you may build. In some cases a project can be approved while the plan is still being drawn up (§ 33 BauGB).

When the development plan will come into force, and whether its content will still change until then, nobody can say for sure in advance.

What does a development plan regulate?

It sets out with legal effect how the plots in its area may be built on and used, for example the type and extent of building use (§ 8 and § 9 BauGB).

Which survey you need and when

For an energy facility in this area, you usually need these surveys.

  1. To secure the land: land parcels and owners

    We find out which land parcels the project touches and who owns them, from the real estate cadastre (Liegenschaftskataster) and the land register (Grundbuch). Surveying for wind and solar farms

  2. For the planning: topographic survey plan

    Boundaries, existing features and terrain, for large areas also as a terrain model from a drone flight.

  3. For the permit: site plan

    Whether it is a building application or an application under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz): the site plan under BauVorlVO M-V is part of it, if needed with the documents for a public easement (Baulast), for example for an access road.

  4. Before building starts: setting out

    Foundations, fence, module rows, crane pads and access roads, on request during construction.

  5. After completion: building survey and as-built records

    Official survey where it is required, for example for wind turbines, plus an as-built plan and cable routes. Official building survey (Gebäudeeinmessung)

Building areas nearby

Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.

All 25 building areas in the municipality of Blankensee

Where the information comes from

Development plans and bylaws
Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
Parcels
Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
Background maps
basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.

Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.

Are you planning to build in this area?

We tell you which survey you need and provide the site plan, setting out and official building survey from one office.