Simple development plan (einfacher Bebauungsplan) · No longer in force
BPlan Nr. 4 Bargischow "Photovoltaik Bargischow Nordost"
The development plan covers an area in the municipality of Bargischow, Landkreis Vorpommern-Greifswald. It is no longer in force. The plan area covers about 31.8 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Bargischow
- District
- Vorpommern-Greifswald
Surveying in this region - Legal status
- No longer in force
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 4 - Area
- about 31.8 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
Not under this development plan any more. What may be built on the land depends on a newer plan. If there is none, the general rules of the Federal Building Code (Baugesetzbuch) apply: for built-up areas (Innenbereich, § 34 BauGB) or for outlying areas (Außenbereich, § 35 BauGB).
You get a binding answer with a preliminary building enquiry (Bauvoranfrage) at the local building authority (untere Bauaufsichtsbehörde).
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
Before you build or buy here, it is worth clearing up these points.
-
Find out if you can build
A topographic survey plan (Lage- und Höhenplan) shows boundaries, existing features and terrain and helps with a preliminary building enquiry (Bauvoranfrage). Topographic survey plan
-
Check the boundaries
We tell you whether the boundaries of your plot have been officially determined, and we check existing boundary marks on site. Boundaries and plots
-
Build
For your project we make the site plan and the setting out and survey the finished building. Surveying for your new house
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Bargischow OT Bargischow 1. Ergänzung
In force since 26 February 2026 400 m away 3 versions
-
Innenbereichssatzung Bargischow OT Gnevezin Ausbau
In progress: Decision to draw up the plan 600 m away
-
Innenbereichssatzung Bargischow OT Gnevezin 1. Änderung
In progress: Draft 850 m away 2 versions
-
BPlan Nr. 3 Bargischow "Photovoltaikanlage Bargischow Südwest"
In progress: Draft 1.2 km away
-
BPlan Nr. 3-2021 Anklam, Hansestadt Industriegebiet, Lilienthalring II
In progress: Early public consultation 1.8 km away Hansestadt Anklam
-
Innenbereichssatzung Bargischow OT Woserow 1. Ergänzung
In force since 26 February 2026 2.0 km away 3 versions
-
BPlan Nr. 1 Bargischow OT Woserow Sondergebiet Erneuerbare Energien
In force since 18 September 2012 2.1 km away
-
BPlan Nr. 1 Bargischow "Sondergebiet für erneuerbare Energien" 2. Änderung
In progress: Decision to draw up the plan 2.2 km away
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.