Simple development plan (einfacher Bebauungsplan) · In force
BPlan Nr. 1 Altenpleen Wohngebiet Altenpleen West
The development plan covers an area in the municipality of Altenpleen, Landkreis Vorpommern-Rügen. It has been in force since 15 May 1996. The plan area covers about 1.4 hectares.
There is a newer version: Amendment no. 2, In force since 14 February 2001
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Altenpleen
- District
- Vorpommern-Rügen
Surveying in this region - Legal status
- In force since 15 May 1996
- Type of plan
- Simple development plan (einfacher Bebauungsplan)
No. 1 - Area
- about 1.4 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The development plan is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is a simple development plan?
It does not contain all the rules of a qualified development plan. Where it says nothing, the general rules for built-up areas (Innenbereich) or outlying areas (Außenbereich) apply (§ 30 Abs. 3 BauGB).
Which survey you need and when
For a house in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
All versions of this plan
The plan has been amended or extended. The latest version is shown first; each version has its own plan area and status.
-
Amendment no. 2, latest version
BPlan Nr. 1 Altenpleen Wohngebiet Altenpleen West 2. Änderung
In force since 14 February 2001 about 1.4 ha
-
Amendment no. 1
BPlan Nr. 1 Altenpleen Wohngebiet Altenpleen West 1. Änderung
In force since 28 January 1997 about 1.4 ha
-
Original version (this page)
BPlan Nr. 1 Altenpleen Wohngebiet Altenpleen West
In force since 15 May 1996 about 1.4 ha
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
Innenbereichssatzung Altenpleen Altenpleen Süd 2. Änderung
In force since 2 August 2006 650 m away 2 versions
-
BPlan Nr. 12 Altenpleen PV Freiflächenanlage Neuenpleener Straße
In progress: Decision to draw up the plan 700 m away
-
BPlan Nr. 13 Altenpleen Demenzdorf Altenpleen
In progress: Decision to draw up the plan 750 m away
-
Vorhabensbezogener BPlan Nr. 8 Altenpleen Beherberungsbetrieb Stralsunder Straße
In force since 3 July 2019 850 m away
-
BPlan Nr. 3 Altenpleen Wohngebiet Florian-Geyer-Straße
In force since 1 January 1999 1.1 km away
-
Vorhabensbezogener BPlan Nr. 2 Preetz Pferde- und Therapiehof Oldendorf
In force since 22 August 2019 1.2 km away Preetz
-
Innenbereichssatzung Preetz Oldendorf 2. Änderung
In force since 2 February 2019 1.3 km away Preetz 2 versions
-
BPlan Nr. 5 Niepars OT Duvendiek Naturcamp Zu den zwei Birken
In force since 20 April 2004 1.8 km away Niepars
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.