Outlying area bylaw (Außenbereichssatzung) · In force
Aussenbereichssatzung Granzin OT Lindenbeck, 1. Änderung
The bylaw covers an area in the municipality of Granzin (Lindenbeck area), Landkreis Ludwigslust-Parchim. It has been in force since 27 February 2013. The plan area covers about 7.4 hectares.
Not legally binding. Only the plan drawing in the Bauportal M-V (state building portal) is valid. View the plan drawing in the Bauportal Plan data: Bauportal M-V (state building portal), as of 13 October 2026. Sources and notes
At a glance
Details according to the Bauportal M-V, as of 13 October 2026
- Location
- Granzin
Village or district Lindenbeck - District
- Ludwigslust-Parchim
Surveying in this region - Legal status
- In force since 27 February 2013
- Type of plan
- Outlying area bylaw (Außenbereichssatzung)
No. 0 - Area
- about 7.4 ha
- Plan documents
- View in the Bauportal M-V (in German)
Legal status
Can you build here?
The bylaw is legally binding. It sets out what may be built on the plots in its area. You find the details in the plan drawing and in the text part.
Whether your own project fits the plan is decided by the local building authority (untere Bauaufsichtsbehörde). You can ask them in advance with a preliminary building enquiry (Bauvoranfrage).
What is an outlying area bylaw?
It makes it easier to build homes in built-up parts of the outlying area that are not mainly used for farming (§ 35 Abs. 6 BauGB). The land still remains outlying area.
Which survey you need and when
For a building project in this area, you usually need these surveys.
-
Before you buy: clear up the boundaries
New plots are often created without boundary stones. Agree in the purchase contract who pays for forming the new land parcels and for the final boundary marking (Schlussabmarkung). Boundaries and plots
-
For the planning: topographic survey plan
The basis for your architect, with boundaries, heights and the rules of the plan (Lage- und Höhenplan). Topographic survey plan
-
For the building application: site plan
It is required by § 7 BauVorlVO M-V. If buildings or their spacing areas (Abstandsflächen) come closer than 0.5 m to the boundary, an official surveying body must make it, for example a publicly appointed surveying engineer (ÖbVI).
-
Before building starts: setting out
We transfer your project to the plot with rough and precise setting out and give the building company fixed height points. Surveying for your new house
-
After completion: official building survey
It is required by § 28 GeoVermG M-V. If we made the site plan and the setting out, the fee is 10 % lower. Official building survey (Gebäudeeinmessung)
Building areas nearby
Other development plans and bylaws around this plan area, sorted by distance, each in its latest version.
-
BPlan Nr. 2 Werder Biogasanlage Werder
In force since 7 January 2017 1.8 km away Werder
-
Innenbereichssatzung Werder OT Werder, Benthen, Neu Benthen, 1. Änderung
In force since 10 April 2010 3.1 km away Werder
-
Vorhabensbezogener BPlan Nr. 1 Werder Errichtung von 12 Windkraftanlagen
In force since 11 November 1998 3.5 km away Werder
-
BPlan Nr. 3 Werder Windpark Lübz Werder
In force since 3 September 2022 3.6 km away Werder
-
Innenbereichssatzung Nr. 1 Stralendorf Plan
In force since 29 June 1993 3.6 km away Stralendorf
-
Innenbereichssatzung Granzin OT Granzin, Beckendorf, Greven, 2. Änderung
In force since 11 April 2010 3.7 km away
-
BPlan Nr. 22 Lübz, Stadt Stadt Lübz, BPlan Nr. 22
In force since 3 September 2022 4.1 km away Stadt Lübz
-
Innenbereichssatzung Rom OT Stralendorf
In force since 8 November 1995 4.3 km away Rom
Where the information comes from
- Development plans and bylaws
- Bauportal Mecklenburg-Vorpommern (the state building portal). We copy the information published there into our database, last updated on 13 October 2026. View this plan in the Bauportal M-V (in German)
- Parcels
- Official real estate cadastre, © GeoBasis-DE/M-V. The map loads the parcels around the plan area directly from the state geodata server.
- Background maps
- basemap.de © GeoBasis-DE/BKG (CC BY 4.0), aerial photo © GeoBasis-DE/M-V.
Only the plan documents published by the municipality are legally binding. Our map is for guidance. If something has changed since the last update, it can differ from the Bauportal.
Are you planning to build in this area?
We tell you which survey you need and provide the site plan, setting out and official building survey from one office.